阳煤五矿选煤厂技术改造实践
Technical renovation in No.5 colliery preparation plant of Yangquan Coal Industry (Group) Co Ltd
-
摘要: 针对阳煤五矿选煤厂因矿井原煤产量和煤质变化导致的原有生产系统不能满足需求的问题,详细分析了生产系统存在的问题,并通过实施相应的技术改造,实现了产能的提升,达到了预期目的。Abstract: Due to the output and quality of coal was changed in Yangquan Coal Industry(Group) Co.,Ltd.No.5 coal preparation plant,the original system can not meet the demand of production,detailed analyzed the issues existed in production system,and through conduct the corresponding technical renovation,realized increasing the production capacity,which achieved the prospected target.
下载: