Abstract:
In order to ensure the advancement of process and equipment in Shunhe coal preparation plant,optimized the preliminary design scheme,this paper detailed described process and equipment,workshop,industrial site arrangement,product loading method and coal slime water treatment system.This optimization realized target of rational layout,advanced technology,save the investment and expansion of the production capacity for medium sized anthracite coal preparation plant,provides certain experience of design scheme optimization for same typed coal preparation plant.