HAO Ming, LI Peng. Renovation of LYUjiatuo Coal Mine′s gangue crushing system[J]. Coal Preparation Technology,2024,52(6):53−56. DOI: 10.16447/j.cnki.cpt.2024.06.009
    Citation: HAO Ming, LI Peng. Renovation of LYUjiatuo Coal Mine′s gangue crushing system[J]. Coal Preparation Technology,2024,52(6):53−56. DOI: 10.16447/j.cnki.cpt.2024.06.009

    Renovation of LYUjiatuo Coal Mine′s gangue crushing system

    • The issues existing in the LYUjiatuo Mine′s crushing system involve low crushing capacity, high energy consumption, large plant vibration and high failure rate of equipment. In order to solve the above problems, the gangue crushing process of first crushing and then screening originally applied by the mine is switched to a process that puts screening ahead of crushing, and the sizing crusher is used in place of the primary raw crusher. With the use of the renovated system, there has been seen a rise of crushing capacity by 67.74%, a drop of power consumption for crushing by 67%, reduction of risks of blocking of crusher by 75.4%, an effectively reduction of maintenance workload. The renovation work made may provided a useful reference for the design and transformation of the crushing system for hard rock materials such as gangue.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return