Practice of the work on renovation and capacity expansion of the 10 MPTY-class extralarge coal preparation plant
-
Graphical Abstract
-
Abstract
The treating capacity of the coal preparation plant under Hongliulin Mining Branch of Shaanmei Group fails to match up with the production capacity of the technically upgraded coal mine. To address this issue, work is made on renovation and capacity expansion of the plant based on thorough analysis of property of run-of-mine coal and by taking into consideration of the existing process design and the process equipment in current use.
-
-