Optimization of coarse slime separation process at Jinneng Coal Preparation Plant
-
Graphical Abstract
-
Abstract
The coarse slime separation process applied at Jinneng Coal Preparation Plant is unsatisfactory in performance. Based on analysis of the process links, technical measures are taken to renovate and optimize the process, so as to eliminate the unnecessary circulation of part of materials and improve separation efficiency.
-
-