LIU Tong-xiang. Implementation of waste water recycling project and its function in Wangjiazhai coal preparation plantJ. Coal Preparation Technology, 2015, 43(5): 48-51. DOI: 10.16447/j.cnki.cpt.2015.05.012
    Citation: LIU Tong-xiang. Implementation of waste water recycling project and its function in Wangjiazhai coal preparation plantJ. Coal Preparation Technology, 2015, 43(5): 48-51. DOI: 10.16447/j.cnki.cpt.2015.05.012

    Implementation of waste water recycling project and its function in Wangjiazhai coal preparation plant

    • To improve waste water treatment system in Wangjiazhai coal preparation plant,according to the actual situation,the waste water recycling project is carried out,including closed water circuit and effluent segregation. The application shows that the waste water can be made full use,and then closed water circuit reduces clean water in separation system,which brings remarkable economic and social benefits.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return