Technology modification on tailings separation system in Dushi coal preparation and power plant
-
Graphical Abstract
-
Abstract
In order to solve problem caused by waste of 0. 25~0. 5mm tailings in Dushi coal preparation and power plant tailings separation system,the technology modification on this system is carried out by taking full advantage of existing equipment. The application shows that 0. 25~0. 5mm coal slime is collected effectively so that economic benefit is remarkable.
-
-