LI Yan. Application of LX-1000 silo wall small spiral chute on at Haiwan coal preparation plantJ. Coal Preparation Technology, 2014, 42(5): 49-51. DOI: 10.16447/j.cnki.cpt.2014.05.012
    Citation: LI Yan. Application of LX-1000 silo wall small spiral chute on at Haiwan coal preparation plantJ. Coal Preparation Technology, 2014, 42(5): 49-51. DOI: 10.16447/j.cnki.cpt.2014.05.012

    Application of LX-1000 silo wall small spiral chute on at Haiwan coal preparation plant

    • In order to reduce the breaking rate of lump coal in Haiwan coal preparation plant,considered the silo structure method and product loading mode,selected the LX-1000 silo wall small spiral chute as device of preventing lump coal breakage.The paper introduced the structure,working principle,technical features,technical parameters of the LX-1000 silo wall small spiral chute,and analyzed the actual application effect of the chute in the Haiwan coal preparation plant.The application shows that the LX-1000 silo wall small spiral chute can effectively reduce the breaking rate of lump coal,improving lump coal quality and so increasing the economic efficiency of enterprise.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return