Process renovation and optimization of production water in Tianzhuang coal preparation plant
-
Graphical Abstract
-
Abstract
To solve the problem existed in production water system after the upgrading renovation of 10 million ton capacity in Tianzhuang coal preparation plant,take the measures of increasing the quantity of recycling water,expend the storage volume of water system,optimized the production water system,so that effectively reduced the consumption of fresh water in production.
-
-