ZUO Quan, HE Xiu-yu. Development and application of scheduling production management information system in Datun coal preparation plantJ. Coal Preparation Technology, 2014, 42(3): 64-67. DOI: 10.16447/j.cnki.cpt.2014.03.023
    Citation: ZUO Quan, HE Xiu-yu. Development and application of scheduling production management information system in Datun coal preparation plantJ. Coal Preparation Technology, 2014, 42(3): 64-67. DOI: 10.16447/j.cnki.cpt.2014.03.023

    Development and application of scheduling production management information system in Datun coal preparation plant

    • According to the needs of developing page,control logic and data separation model of scheduling production management information system in Datun coal preparation plant production,based on deeply study the main developing platform and requirements of the plant,selected and development of CakePHP,PHPExcel,pChart and other open source software required by the system,and applied in the PHP,Apache and Mysql platform. The production practice shows that the new system of scheduling production management information is loose coupling and easy expansion,after put into application,effectively improved the transfer efficiency of the scheduling production management information,and has the value of popularization and application.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return