BIAN Li-ying. The realization of communication between the upper managing system and PLC by C# programmingJ. Coal Preparation Technology, 2014, 42(2): 74-76. DOI: 10.16447/j.cnki.cpt.2014.02.019
    Citation: BIAN Li-ying. The realization of communication between the upper managing system and PLC by C# programmingJ. Coal Preparation Technology, 2014, 42(2): 74-76. DOI: 10.16447/j.cnki.cpt.2014.02.019

    The realization of communication between the upper managing system and PLC by C# programming

    • Introduced the dynamic link library function which published by PRODAVE software of Siemens,described the method of using C# call for the dynamic link library function in PRODAVE software,and take the automatic system of Jiexiu Baoping coal preparation plant as an example,detailed introduced how to use C# programming and realizing the communication in MPI mode between the upper control computer and Siemens S7-300 series PLC.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return