YE Hui-feng. Technical renovation in No.5 colliery preparation plant of Yangquan Coal Industry (Group) Co LtdJ. Coal Preparation Technology, 2013, 41(4): 86-88. DOI: 10.16447/j.cnki.cpt.2013.04.023
    Citation: YE Hui-feng. Technical renovation in No.5 colliery preparation plant of Yangquan Coal Industry (Group) Co LtdJ. Coal Preparation Technology, 2013, 41(4): 86-88. DOI: 10.16447/j.cnki.cpt.2013.04.023

    Technical renovation in No.5 colliery preparation plant of Yangquan Coal Industry (Group) Co Ltd

    • Due to the output and quality of coal was changed in Yangquan Coal Industry(Group) Co.,Ltd.No.5 coal preparation plant,the original system can not meet the demand of production,detailed analyzed the issues existed in production system,and through conduct the corresponding technical renovation,realized increasing the production capacity,which achieved the prospected target.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return