TAO Si-wen, YANG Zong-mei. Application of two stage flotation clean coal dewatering process in Luling colliery coal preparation plantJ. Coal Preparation Technology, 2013, 41(4): 46-48. DOI: 10.16447/j.cnki.cpt.2013.04.013
    Citation: TAO Si-wen, YANG Zong-mei. Application of two stage flotation clean coal dewatering process in Luling colliery coal preparation plantJ. Coal Preparation Technology, 2013, 41(4): 46-48. DOI: 10.16447/j.cnki.cpt.2013.04.013

    Application of two stage flotation clean coal dewatering process in Luling colliery coal preparation plant

    • Analyzed the problem in flotation clean coal dewatering system in Luling coal preparation plant,introduced the two stage dewatering process that is the flotation directed dewatering with horizontal solid bowl centrifuge,the overflow and filtrate desliming and then go to secondary flotation or direct flotation,the clean coal produced dewatered by secondary dewatering process using quick open filter press,which eliminated the effect of concentrate froth on production,solved the problem of difficult to dewatering of flotation clean coal in Luling coal preparation plant.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return