Technical renovation of returning raw coal to separation in Fuxing coal preparation plant
-
Graphical Abstract
-
Abstract
This paper described the production status of the Fuxing Coal Preparation Plant of Hebi coal mining group,analyzed the effect of the raw coal directly falling on the ground that can not return to separation on the coal preparation plant,presents the technical renovation plans,and based on the comparison and selection,finally determined the best solution.
-
-