MENG Rui-qi, XIAO Yao-zong. The practice of adjusting & re-arranging for pipelines in Ruilong coal preparation plantJ. Coal Preparation Technology, 2013, 41(1): 52-54,57. DOI: 10.16447/j.cnki.cpt.2013.01.016
    Citation: MENG Rui-qi, XIAO Yao-zong. The practice of adjusting & re-arranging for pipelines in Ruilong coal preparation plantJ. Coal Preparation Technology, 2013, 41(1): 52-54,57. DOI: 10.16447/j.cnki.cpt.2013.01.016

    The practice of adjusting & re-arranging for pipelines in Ruilong coal preparation plant

    • According to the problem existed in pipeline in production adjusting at Ruilong coal preparation plant,the water supply pipelines for medium draining screen,ground cleaning water and shaft sealing water were re-adjusted.After the re-adjusting and re-arranging of the pipeline and pipe network,the production system in that plant operated stably and reliably,and the clean coal yield increased by 6.06%,medium consumption and power consumption for ton coal washed decreased by 0.17 kg and 0.37 kW respectively,obtained good economic benefit.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return