Application of high precision quick train loading system in Huangling No.1 coal preparation plant
-
Graphical Abstract
-
Abstract
According to the problems existed in original loading system in Huangling No.1 coal preparation plant,through the technical renovation,built the high precision quick train loading system.The paper introduced the working principle,structure,function and its application result of the high precision quick train loading system in Huangling No.1 coal preparation plant.
-
-